煤炭氣化複循環發電廠製造管線天然氣之製程最適研究
學年 101
學期 1
出版(發表)日期 2012-08-01
作品名稱 煤炭氣化複循環發電廠製造管線天然氣之製程最適研究
作品名稱(其他語言) Process Optimization on Pipeline Natural-Gas Production from an Igcc Power Plant
著者 陳錫仁
單位 淡江大學化學工程與材料工程學系
描述 計畫編號:NSC101-2221-E032-051
 研究期間:201208~201307
 研究經費:550,000
委託單位 行政院國家科學委員會
摘要 This project involves the optimal design of pipeline natural gas associated from an integrated gasification combined cycle (IGCC) power plant. The design capacity will be set at 10,000 kg/hr pipeline natural gas. IGCC is the most advanced technology for generating electricity from coal cleanly. This project will include coal crushing and screening, gasification, syngas production, chemical shift reaction, methanation, power generation and the main streams connecting these units. IGCC is a multi-generation plant, not only electricity but also clean fuel and high-value chemicals can be produced. This project will find its applications in (1) coal utilization, (2) clean coal technology, and (3) policy planning on the green energy/energy security. 本研究計畫擬進行「煤炭氣化複循環發電廠製造管線天然氣之最適化製程研究」,管線天然氣定在10,000kg/hr的量產。IGCC發電技術係由煤炭產生電力的一種最進步的淨煤發電技術,本研究之IGCC操作單元將涵蓋:粉煤系統處理區、氣化爐區、合成氣產製區、化學遷移反應區、甲烷重組區、複循環動力區及主要物流相互連結區等。IGCC發電技術係多重機能的技 術,除發電外也可同時製造清潔燃料、高值化學品等。 本計畫研究成果包括:(1)煤炭利用,(2)淨煤技術,(3)綠色產業/能源安全政策規劃等。
關鍵字 煤炭氣化; 淨煤技術; 複循環發電技術; 管線天然氣; Coal Gasification; Clean Coal Technology; IGCC; Pipeline Gas
語言 zh_TW
相關連結

機構典藏連結 ( http://tkuir.lib.tku.edu.tw:8080/dspace/handle/987654321/103126 )

機構典藏連結