期刊論文

學年 110
學期 1
出版(發表)日期 2022-01-01
作品名稱 Soft logic delay analysis technique
作品名稱(其他語言)
著者 Su-Ling Fan
單位
出版者
著錄名稱、卷期、頁數 Automation in Construction 133, 103971
摘要 Current delay analysis techniques assume that there is only one logical sequence of activities in a project. However, in a real construction project, the relationship of activities can be demonstrated by both fixed and soft logic. Fixed logic requires activities to be executed in a specific order, whereas soft logic allows activities to be executed in various orders. Due to the existence of soft logic and the contractor's obligation to mitigate delays, it is necessary to update the logic to calculate Extension of Time (EOT). However, when soft logic is present in a schedule, manual updates are time-consuming and error-prone. To facilitate soft logic updates, several models have been proposed, however, these methods only update soft-logics within activities of the same work item, rather than project-wide. To overcome the limitations of the previous research, this paper proposes an algorithm to update schedules according to delay events project-wise. Furthermore, the proposed model has been verified using practical cases, demonstrating a successful way of applying this model to update schedules based on delay events, allowing EOT to be calculated automatically as well as more accurately and reasonably.
關鍵字 Soft-logic;Delay claims;Extension of time (EOT)
語言 en
ISSN 1872-7891
期刊性質 國外
收錄於 SCI
產學合作
通訊作者
審稿制度
國別 NLD
公開徵稿
出版型式 ,電子版,紙本
相關連結

機構典藏連結 ( http://tkuir.lib.tku.edu.tw:8080/dspace/handle/987654321/122516 )