A modified short-run type II continuous sampling plan
學年 90
學期 2
出版(發表)日期 2002-03-01
作品名稱 A modified short-run type II continuous sampling plan
作品名稱(其他語言)
著者 蔡宗儒; Tsai, Tzong-ru
單位 淡江大學統計學系
出版者 Wiley-Blackwell
著錄名稱、卷期、頁數 Quality and Reliability Engineering International 18(2), pp.155-161
摘要 In this article, a modified continuous sampling of type II is provided for finite production runs. The suggested sampling plan revises the continuous sampling plan-2 of Yang (1983). The proposed plan places no predetermined limit on the number of items to be inspected until the second defect is detected when in partial inspection mode. A similar derivation to that of Yang is used to find an approximation to the average outgoing quality of the modified continuous sampling plan-2 in finite production runs. Some tables are provided to aid in the selection of the clearance number and sampling fraction when the production run length and an average outgoing quality limit are given.
關鍵字
語言 en
ISSN 0748-8017
期刊性質 國外
收錄於
產學合作
通訊作者
審稿制度
國別 GBR
公開徵稿
出版型式 ,紙本
相關連結

機構典藏連結 ( http://tkuir.lib.tku.edu.tw:8080/dspace/handle/987654321/27388 )

機構典藏連結

SDGS 優質教育,產業創新與基礎設施