關鍵字查詢 | 類別:期刊論文 | | 關鍵字:Case‐based allocation of onsite supervisory manpower for construction projects

[第一頁][上頁]1[次頁][最末頁]目前在第 1 頁 / 共有 01 筆查詢結果
序號 學年期 教師動態
1 97/1 企管系 楊立人 教授 期刊論文 發佈 Case‐based allocation of onsite supervisory manpower for construction projects , [97-1] :Case‐based allocation of onsite supervisory manpower for construction projects期刊論文Case‐based allocation of onsite supervisory manpower for construction projectsChen, Jieh-Haur; Yang, Li-Ren; Chen, W.-H.; Chang, C.-K.淡江大學企業管理學系Allocation;human resource management;onsite;overheads;supervisory manpower costsAbingdon: RoutledgeConstruction Management and Economics 26(8), pp.805-81499學年度楊立人研究獎補助論文In the highly competitive worldwide construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience‐based cost estimates or allocations of onsite supervisory manpower often offset the profit gained from the project and may even jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case‐based reasoning to automate the allocation of onsite supervisory manpower and its costs. The method is founded upon laborious data collection processes and analysis by matching statistical assum
[第一頁][上頁]1[次頁][最末頁]目前在第 1 頁 / 共有 01 筆查詢結果