1 |
105/2 |
統計系 蔡宗儒 教授於
期刊論文
發佈
Control charts for generalized exponential distribution percentiles
,
[105-2]
關鍵字:Average run length;Control charts;False alarm rate;Parametric bootstrap methods;Percentile;Shewhart-type chart
|
2 |
106/2 |
統計系 蔡宗儒 教授於
期刊論文
發佈
Adaptive control charts for skew-normal distribution
,
[106-2]
關鍵字:adaptive control charts;average run length;cumulative sum charts;exponentially weighted movingaverage charts;Markov chain approach
|
3 |
105/2 |
統計系 蔡宗儒 教授於
期刊論文
發佈
MEWMA control chart and process capability indices for simple linear profiles with within-profile autocorrelation
,
[105-2]
關鍵字:Autocorrelation;average run length;process capability analysis;profile monitoring
|
4 |
105/1 |
統計系 王藝華 副教授於
期刊論文
發佈
Phase II profile monitoring based on proportional odds models
,
[105-1]
關鍵字:Average run length; Change point estimation; MEWMA; Out of control; Profile monitoring; Proportional odds models
|
5 |
100/1 |
統計系 王藝華 副教授於
期刊論文
發佈
On the Monitoring of Simple Linear Berkson Profiles
,
[100-1]
關鍵字:average run length;change point;control chart;EWMA;generalized likelihood ratio
|
6 |
99/2 |
統計系 蔡宗儒 教授於
期刊論文
發佈
Exponentially weighted moving average control charts for three-level products
,
[99-2]
關鍵字:Average run length;EWMA control chart;Markov Chain;Quality value function;Shewhart control chart
|
7 |
102/2 |
統計系 王藝華 副教授於
期刊論文
發佈
Monitoring general linear profiles using simultaneous confidence sets schemes
,
[102-2]
關鍵字:Profile monitoring; Simultaneous confidence sets; EWMA; Average run length; Change point estimation; Phase II study
|
8 |
101/2 |
統計系 王藝華 副教授於
期刊論文
發佈
Monitoring General Linear Profiles When Random Errors Have Contaminated Normal Distributions
,
[101-2]
關鍵字:trimmed least squares estimation;average run length;control chart;EWMA;out-of-control;Phase I;Phase II
|
9 |
97/2 |
統計系 蔡宗儒 教授於
期刊論文
發佈
Simulated shewhart control chart for monitoring variance components
,
[97-2]
關鍵字:Average run length;control chart quality control;random effects;variance components
|